We inspire companies to add value to their existing oil and gas wells while commercializing new technologies to help them stay one step ahead of the competition. Our cutting edge systems perform at an exceptional level to offer innovative solutions to our customers.
Restores Wellbore To Pre-Frac Hits Levels, Reversing 40%
Decline In Eur.
Decline In Eur.
Frac hits are an increasing problem in the shale industry. Fortunately, operators now have a field proven methodology to remediate frac hit wells and fully restore wellbore production.
A Case Study On How The Excite System Treated 46 Zones In
A Depleted Well Within 15 Hours And Added $500k Npv To Wellbore
A Depleted Well Within 15 Hours And Added $500k Npv To Wellbore
Acid Restimulation
The EXCITE tool successfully placed a total of 5,000 gallons of acid into the target zones. All treatments were carried out in a single trip with industry leading efficiency between stages. Sustained production at over ten times than pre-treatment levels, thus extended the lifetime of the wellbore, and added significant value to our client’s asset portfolio.
PROPPANT REFRAC
The Excite System™ successfully delivered a customized solution to the client when the other technologies were not feasible, unlocking huge additional value for the client. Initial production was increased by 10 times after treatment and one year later the production is still stable at 5 times above pre-refrac levels.
SALT WATER DISPOSAL WELL REVITALIZED BY THE EXCITE TECHNOLOGY, CREATES $2.5M IN VALUE TO OPERATOR
During the treatment, several of the zones exhibited new-breakdown pressure behavior, indicating that the stimulation just broke down new rock and created new fractures. Prior to the treatment, the well was injecting 1000 BWPD at 1500 psi pressure. Following the re-stimulation, the well was taking fluid at >3,000 BWPD on a vacuum. The successful deployment proved SWD revitalization as a viable application for the EXCITE System™. Eliminated the need for drilling new SWD and saved customer $2.5M USD.
HOW THE EXCITE SYSTEM TREATED NINE EXISTING AND SIX NEW PREF
CLUSTERS IN A SINGLE TRIP TO DELIVER SUSTAINED PRODUCTION UPLIFT
CLUSTERS IN A SINGLE TRIP TO DELIVER SUSTAINED PRODUCTION UPLIFT
120% immediate increase in oil production following treatment.
85% higher production five months after treatment versus before treatment.
Post treatment decline follows same decline curve as type curve for well.
Overall project return of $160,000 NPV(10) and 60% IRR. Customer has identified more candidate wells for additional treatments.
85% higher production five months after treatment versus before treatment.
Post treatment decline follows same decline curve as type curve for well.
Overall project return of $160,000 NPV(10) and 60% IRR. Customer has identified more candidate wells for additional treatments.